Yahoo Canada Web Search

Search results

  1. Toronto Contours 1 metre intervals. Creator. Marcel Fortin, University of Toronto Map Library. Date of creation. 2002. Temporal extent. 2002. Publisher. Marcel Fortin, Map and Data Library.

  2. Apr 16, 2024 · A topographic map of Toronto provides a detailed visualization of the city’s elevation and contour lines. These lines connect points of equal elevation and depict the changes in the landscape. By examining the map, one can identify the high and low points in Toronto, giving insight into the city’s natural features and landform patterns.

  3. Average elevation: 113 m • Toronto, Golden Horseshoe, Ontario, M6K 1X9, Canada • Despite its deep ravines, Toronto is not remarkably hilly, but its elevation does increase steadily away from the lake. Elevation differences range from 76.5 metres (251 ft) above sea level at the Lake Ontario shore to 209 m (686 ft) ASL near the York University grounds in the city's north end at the ...

  4. Jul 17, 2014 · A topographic map is a detailed, accurate graphic representation of features that appear on the Earth's surface, including: human-made (such as roads and railways, provincial and national parks, place names, municipal and township boundaries, lots and concessions) natural (such as lakes and rivers, falls, rapids and rocks, wooded areas, wetlands)

  5. Flood lines; Topographic Contour Lines. Toronto Contour Lines 1m; Elevation. Note that slope, aspect, hillshade, and contours can be derived from this if needed; Greater Toronto Area 2002 Digital Elevation Model; Provincial Digital Elevation Model 2019; Toronto Building Outlines; Toronto 3D Massing (includes building heights) OpenStreetMap ...

  6. Toronto, Ontario, Canada • Visualization and sharing of free topographic maps.

  7. People also ask

  8. Aug 16, 2024 · The data included in the Toronto topographic map, provided through Equator, comes from the publicly funded Ontario GeoHub powered by Land Information Ontario. This dataset is a compilation of lidar data from multiple acquisition projects carried out on behalf of the Province of Ontario, between 2014 and 2018 in the City of Toronto. Try Now.

  1. People also search for