  1. Nov 6, 2020 · Once contamination is confirmed on the property, the next logical step in the soil management process is to create a plan for soil remediation. Soil remediation is a two-step process that includes: Creating a plan for the removal of contaminated soil. Locating a landfill that will take contaminated soil. Locating a landfill that will take ...

    • Background
    • Purpose and Application of This Document
    • Beneficial Reuse and Management Options
    • General Excess Soil Management Considerations
    • Ontario Regulation 153/04 and The Soil and Ground Water Standards

    Soil is an important resource. The protection and conservation of soil in Ontario is a valuable component of maintaining the environment for present and future generations. The Ministry of the Environment (MOE) encourages the beneficial reuse of excess soil in a manner promoting sustainability and the protection of the environment. The best practic...

    Activities Covered under these Best Management Practices

    The best management practices in this document provide guidance on how to handle excess soil beginning at the place where the soil is excavated (a "Source Site"), during the transportation of the excess soil, and through to a site where the excess soil can be reused for a beneficial purpose (a "Receiving Site"). This document also includes recommendations for temporary storage of excess soil at an intermediate site, between the Source Site and Receiving Site, where the intermediate site (a "T...

    This Document and Applicable Law

    All those who create, manage, transport, receive or store excess soil are responsible for ensuring that the excess soil is managed in an environmentally sound manner. They must also meet all applicable legal requirements, including current provincial and federal regulatory requirements, such as: site alteration, noise and traffic by-laws and permitting regimes established by municipalities and Conservation Authorities; the soil management provisions in Ontario Regulation 153/04 that relate to...

    All stakeholders should look for opportunities to minimize the amount of soil to be excavated during construction projects. When soil does need to be excavated, the MOE encourages the reuse of the excavated soil at the site where it is excavated, to limit the amount of excess soil that requires management off site. The MOE encourages use of the exc...

    Qualified Persons

    Those who manage excess soil are encouraged to retain the services of a Qualified Person (QP) within the meaning of section 5 of Ontario Regulation 153/04. QPs are professional geoscientists and professional engineers. A QP who is retained should be someone who can exercise professional judgment based on his or her experience in order to advise on appropriate reuse options for the excavated soil or excess soil, and make these decisions based on appropriate analysis and characterization of the...

    Soil Quality

    Understanding whether the placement of soil may cause an adverse effect or a degradation of the pre-existing condition of the Receiving Site requires knowledge of the quality of the excess soil from the Source Site and the quality of soil at the Receiving Site. Excess soil reuse is encouraged where chemical analyses of soil at the Source and Receiving Sites determine that the soil is appropriate to be reused at the Receiving Site. The analyses should be based on the specific conditions at the...

    Laboratory Analysis and Analytical Procedures

    It is recommended that soil analyses be undertaken by a laboratory with an internationally recognized accreditation body [e.g. Standards Council of Canada (SCC) or Canadian Association for Laboratory Accreditation (CALA)] and in accordance with the International Standard ISO/IEC 17025 General Requirements for the Competence of Testing and Calibration Laboratories. It is recommended that analytical procedures should be conducted as outlined in section 47 of Ontario Regulation 153/04 and in the...

    Ontario Regulation 153/04 sets out standards for soil, ground water and sediment which apply when a Record of Site Condition (RSC) is submitted to the MOE for filing on the Environmental Site Registry. The generic contaminant standards are set out in, "Soil, Ground Water and Sediment Standards, for Use under Part XV.1 of the Environmental Protectio...

  2. 3.2 Soil Testing (texture, compaction, organic matter, pH) 4. Soil Management Plans 4.1 Developing Soil Management Plans 4.2 Stepwise Procedures 4.3 Construction Permit Submissions 5. Implementing Soil Mgmt. Plans 5.1 Materials and Equipment 5.2 Stepwise Procedures 6. Verifying Soil Quality and Depth 6.1 Site Inspection Materials and Equipment

  3. A Soil Management Plan or Soil Excavation Plan provides guidelines for grading and construction projects at sites with potential contamination issues or ongoing remediation. At a minimum, the document comprises a site-specific health and safety plan, an excavation boundary site map, and a series of cross-sections.

  4. Jan 4, 2024 · Creating a soil management plan is a big part of the ethos at BASIS, as we support people and businesses in protecting the environment for a sustainable future. This blog will outline how to create a soil management plan, as well as the various benefits these plans can have in improving crop yields and growing food sustainably.

  5. Without a detailed Soil Resource Plan there is the risk of losing, damaging or contaminating valuable soil resources. The purpose of this Soil Management Plan is to outline principles for soil management to ensure the integrity of the resource during and post-construction. This plan should be read together with the Emergency Response Plan in ...

  6. People also ask

  7. Jun 7, 2021 · The main goal of a Soil Management Plan is to meet all required Environmental Screening Levels (ESLs). ESLs can be applied to a range of concerns and mediums, from soil to air, and were created as ...