Search results
NFPA 72 currently recognized four methods of communication from the protected premises to the supervising station for fire alarm systems: Performance-Based Technology, Digital Alarm Communicator Systems, Two-Way Radio Frequency (RF) Multiplex, and One-Way Private Radio Alarm Systems.
The fire alarm panel controls the alarms and events of the entire system. The EK‐WL8‐TRH wireless translator is connected directly to the fire alarm panel via the Hochiki ESP Enhanced System Protocol and communicates with the wireless devices and the wireless expanders.
Apr 8, 2024 · The process begins with the detection of fire indicators (smoke or heat) by the detectors, which then send a radio signal to the control panel. Then, the signal is transmitted wirelessly, as a wireless fire alarm, using radio waves.
- Fire Alarm & Emergency Communication System Limitations
- Alarm Signaling Communications:
- FCC Warning
- Software Downloads
- Documentation Feedback
- FireSystems.TechPubs@honeywell.com
- 1.1 Purpose
- 1.2 Assumed Knowledge
- 1.3 Additional References
- 1.6 Abbreviations
- 1.7 Cybersecurity Recommendations
- 2.2 Agency Approvals
- 2.3 Specifications
- Specifications
- 2.5 LED Indicators
- 2.6.1 Before Installing
- 2.7 Mounting and Wiring
- 2.7.3 Gateway Powered by the SLC
- 2.8 Configuration and Programming
- Start-up Mode
- Profile Configured
- Mesh Formation
- Initial Mesh Restructuring Mode
- Normal Mode
- Rescue Mode
- Mesh Restructuring Mode
- Bootloader Mode
- Neighboring Network Scan
- 2.9.3 Lock/Unlock the Gateway
- 2.9.4 Enable/Disable Max Gateway Trouble Reporting
- Completed Wireless Network
- 2.9.5 Weak Link Trouble Reporting
- 2.9.6 Collapse Network Command
- 2.9.7 Silence Network Command
- 2.9.9 Activation of Wireless Output Devices
- Trouble Events
- FCC ID: PV3WFSLCDUI
- 3.3 Specifications
- 3.5 Display Driver LED Indicators
- Restoring to Factory Default Without Using SWIFT Tools
- Bootloader
- Button
- RF Comm Loss
- Trouble Duplicate Address
- Trouble Class A Missing 2nd Link
- Trouble Weak Link Low Signal Strength
- Capacity Exceeded
- 4.3 Specifications
- 4.5 Configuration and Programming
- Repeater
- Site Survey Mode
- Bootloader Mode
- Mesh Participant Modes
- 5.2.1 FACP
- FCC ID: PV3WFSADPT
- A.1 Description
- A.2 Launching SWIFT Tools
- A. Opening an Existing Jobsite
- A. Connecting to the Gateway
- Appendix B: Site Survey
- C.3 Testing the Wireless Network
- Parent-Child Devices
- Orphan Devices
- Class A Compliance
- C.3.2 History Events
- C.3.3 Network Snapshots
- C.3.4 Network Statistics
- C.3.5 Device Attributes
- Action Required
- Condition
- Action Required
- Condition
- Action Required
- E.1 W-USB Adapter Upgrade Procedure
- E.2 Mesh Network Firmware Upgrade/Downgrade Procedure
- NO FIRE PROTECTION
- Phase 2 - Mesh upgrade in progress:
While a life safety system may lower insurance rates, it is not a substitute for life and property insurance! An automatic fire alarm system—typically made up of smoke detectors, heat detectors, manual pull stations, audible warning devices, and a fire alarm control panel (FACP) with remote notification capability—can provide early warning of a dev...
IP connections rely on available bandwidth, which could be lim-ited if the network is shared by multiple users or if ISP policies impose restrictions on the amount of data transmitted. Service packages must be carefully chosen to ensure that alarm signals will always have available bandwidth. Outages by the ISP for maintenance and upgrades may also...
WARNING: This equipment generates, uses, and can radi-ate radio frequency energy and if not installed and used in accordance with the instruction manual may cause interfer-ence to radio communications. It has been tested and found to comply with the limits for class A computing devices pur-suant to Subpart C of Part 15 of FCC Rules, which is design...
In order to supply the latest features and functionality in fire alarm and life safety technology to our customers, we make frequent upgrades to the embedded software in our products. To ensure that you are installing and programming the latest features, we strongly recommend that you download the most current version of software for each product p...
Your feedback helps us keep our documentation up-to-date and accurate. If you have any comments or suggestions about our online Help or printed manuals, you can email us. Please include the following information: Product name and version number (if applicable) Printed manual or online Help Topic Title (for online Help) Page number (for printed manu...
Please note this email address is for documentation feedback only. If you have any technical issues, please contact Technical Services. This symbol (shown left) on the product(s) and / or accompanying documents means that used electrical and electronic products should not be mixed with general household waste. For proper treatment, recovery and rec...
The SWIFT® Network Manual provides an overview of the following: Wireless fire alarm system Instructions for installing and configuring the wireless devices Information on monitoring the status of the wireless devices Removal and replacement procedures of the Wireless Gateway and Display Driver Testing, maintenance, and firmware upgrade information...
This document is created with the assumption that all users are familiar with working on a PC and laptop for configuration purposes. Install-ers should be familiar with the fire alarm and related service standards. The terminology and level of details of this document reflect this assumption.
The table below provides a list of documents referenced in this manual, as well as documents for selected other compatible devices.
The following table lists the abbreviations and their definitions used in this manual.C
When using SWIFT Tools to update the firmware of the gateway or devices, ensure updates are performed in a secure location where no eavesdropping on the wireless signals is possible. Ensure the PC running SWIFT Tools has full disk encryption. Full encryption of any backed-up data is also recommended. The wireless gateway should be secured in a loca...
NOTE: SWIFT W-GATE requires a UL-listed control panel and UL-listed wireless devices. SWIFT W-GATEA requires a ULC-listed control panel and ULC-listed wireless devices. See Section 4, “Wireless Devices” for a list of specific wireless devices & their listings. Refer to the specific panel’s documentation for its UL/ULC listings.
Following are the specifications of the wireless gateway.
External Supply Electrical Ratings SLC Electrical Ratings Maximum current when using the external supply Maximum current when using the SLC power supply Maximum SLC Resistance Minimum signal strength level needed at the receiver for a primary path with weak link trouble reporting enabled. Minimum signal strength level needed at the receiver for a s...
The two LEDs on the gateway blink in the same pattern to allow the LED to be viewed from any angle. LED patterns are explained in Appendix D.
Choose a location for the gateway that is clean, dry, and vibration-free. The area should be readily accessible with sufficient room to easily install and maintain the gateway. Metal obstructions impede the radio frequency communication and should be avoided. Carefully unpack the system and inspect for shipping damage if any. All wiring must comply...
WARNING: POLYPROPYLENE ELECTRICAL INSULATION MATERIAL ! ENSURE THAT THE POLYPROPYLENE ELECTRICAL INSULATION MATERIAL COVERING THE PRINTED CIRCUIT BOARD INSIDE THE GATEWAY IS NOT REMOVED OR TAMPERED WHILE INSTALLING OR CLEANING.
To power the gateway using the signaling line circuit, connect the gateway as described in the table and graphic below:
To successfully configure and/or program the gateway: Create a profile. A profile binds a gateway and the devices in a mesh network together. The profile will contain a mesh ID that is used when forming the associations. All devices, including the gateway, require a common profile. Assign a profile using SWIFT Tools. Assign the profile to every dev...
Start-up mode is a temporary mode of operation. During start-up mode a profile can be created or removed. The start-up period lasts for 10 seconds. If a particular unit contains a profile, the LEDs double blink yellow every second. If the unit does not contain a profile, the LEDs double blink red every second. During start-up, the gateway does not ...
The gateway enters the profile configured mode once a profile is assigned by SWIFT Tools. Profile configured mode is a temporary mode before the gateway transitions to mesh formation or normal mode.
The gateway must have a profile before entering mesh formation mode. The gateway and the peripheral devices do not provide any fire pro-tection in this mode. The gateway enters mesh formation mode: after creating a profile using the mesh formation sensor. after activating the mesh formation sensor with a magnet when the gateway contains a profile. ...
Initial mesh restructuring mode automatically runs after each mesh formation. The gateway and peripheral devices do not provide fire pro-tection during the initial mesh restructuring mode. Mesh restructuring analyzes signal strengths between devices. The gateway designates the primary and secondary communication paths between devices that provide a...
Normal mode is the network’s standard operating state. The mesh network has been formed and is providing fire protection. The mesh net-work will continuously search for additional devices with a matching profile to join the mesh. To avoid interference, the mesh network peri-odically checks for adjacent mesh networks created by Honeywell. The gatewa...
During normal mode, if an out-of-network device with a matching profile is discovered by the network, the gateway will trigger rescue mode in all communicating devices. All devices in communication continue to provide fire protection during rescue mode but also search for a lost or added device. Rescue mode automatically terminates 3 minutes after ...
In addition to the initial mesh restructuring mode, mesh restructuring is automatically performed after any restoration of communication to a device or to recover from a link failure (Class A fault). Mesh restructuring that occurs during normal mode does not generate a trouble mes-sage. During mesh restructuring, fire protection is provided by all ...
The gateway will distribute the new application image to the mesh network of devices during this phase. SWIFT Tools is not required to be in communication during this phase, but will provide indication of the progress of the upgrade when it is in communication. The distribution of the new application image may take up to 90 minutes depending on the...
The gateway will distribute the new application image to the mesh network of devices during this phase. SWIFT Tools is not required to be in communication during this phase, but will provide indication of the progress of the upgrade when it is in communication. The distribution of the new application image may take up to 90 minutes depending on the...
The gateway will distribute the new application image to the mesh network of devices during this phase. SWIFT Tools is not required to be in communication during this phase, but will provide indication of the progress of the upgrade when it is in communication. The distribution of the new application image may take up to 90 minutes depending on the...
The gateway will distribute the new application image to the mesh network of devices during this phase. SWIFT Tools is not required to be in communication during this phase, but will provide indication of the progress of the upgrade when it is in communication. The distribution of the new application image may take up to 90 minutes depending on the...
The gateway will distribute the new application image to the mesh network of devices during this phase. SWIFT Tools is not required to be in communication during this phase, but will provide indication of the progress of the upgrade when it is in communication. The distribution of the new application image may take up to 90 minutes depending on the...
The gateway will distribute the new application image to the mesh network of devices during this phase. SWIFT Tools is not required to be in communication during this phase, but will provide indication of the progress of the upgrade when it is in communication. The distribution of the new application image may take up to 90 minutes depending on the...
The gateway will distribute the new application image to the mesh network of devices during this phase. SWIFT Tools is not required to be in communication during this phase, but will provide indication of the progress of the upgrade when it is in communication. The distribution of the new application image may take up to 90 minutes depending on the...
The gateway will distribute the new application image to the mesh network of devices during this phase. SWIFT Tools is not required to be in communication during this phase, but will provide indication of the progress of the upgrade when it is in communication. The distribution of the new application image may take up to 90 minutes depending on the...
The gateway will distribute the new application image to the mesh network of devices during this phase. SWIFT Tools is not required to be in communication during this phase, but will provide indication of the progress of the upgrade when it is in communication. The distribution of the new application image may take up to 90 minutes depending on the...
The gateway will distribute the new application image to the mesh network of devices during this phase. SWIFT Tools is not required to be in communication during this phase, but will provide indication of the progress of the upgrade when it is in communication. The distribution of the new application image may take up to 90 minutes depending on the...
The gateway will distribute the new application image to the mesh network of devices during this phase. SWIFT Tools is not required to be in communication during this phase, but will provide indication of the progress of the upgrade when it is in communication. The distribution of the new application image may take up to 90 minutes depending on the...
The gateway will distribute the new application image to the mesh network of devices during this phase. SWIFT Tools is not required to be in communication during this phase, but will provide indication of the progress of the upgrade when it is in communication. The distribution of the new application image may take up to 90 minutes depending on the...
The gateway will distribute the new application image to the mesh network of devices during this phase. SWIFT Tools is not required to be in communication during this phase, but will provide indication of the progress of the upgrade when it is in communication. The distribution of the new application image may take up to 90 minutes depending on the...
The gateway will distribute the new application image to the mesh network of devices during this phase. SWIFT Tools is not required to be in communication during this phase, but will provide indication of the progress of the upgrade when it is in communication. The distribution of the new application image may take up to 90 minutes depending on the...
The gateway will distribute the new application image to the mesh network of devices during this phase. SWIFT Tools is not required to be in communication during this phase, but will provide indication of the progress of the upgrade when it is in communication. The distribution of the new application image may take up to 90 minutes depending on the...
The gateway will distribute the new application image to the mesh network of devices during this phase. SWIFT Tools is not required to be in communication during this phase, but will provide indication of the progress of the upgrade when it is in communication. The distribution of the new application image may take up to 90 minutes depending on the...
The gateway will distribute the new application image to the mesh network of devices during this phase. SWIFT Tools is not required to be in communication during this phase, but will provide indication of the progress of the upgrade when it is in communication. The distribution of the new application image may take up to 90 minutes depending on the...
The gateway will distribute the new application image to the mesh network of devices during this phase. SWIFT Tools is not required to be in communication during this phase, but will provide indication of the progress of the upgrade when it is in communication. The distribution of the new application image may take up to 90 minutes depending on the...
The gateway will distribute the new application image to the mesh network of devices during this phase. SWIFT Tools is not required to be in communication during this phase, but will provide indication of the progress of the upgrade when it is in communication. The distribution of the new application image may take up to 90 minutes depending on the...
The gateway will distribute the new application image to the mesh network of devices during this phase. SWIFT Tools is not required to be in communication during this phase, but will provide indication of the progress of the upgrade when it is in communication. The distribution of the new application image may take up to 90 minutes depending on the...
The gateway will distribute the new application image to the mesh network of devices during this phase. SWIFT Tools is not required to be in communication during this phase, but will provide indication of the progress of the upgrade when it is in communication. The distribution of the new application image may take up to 90 minutes depending on the...
The gateway will distribute the new application image to the mesh network of devices during this phase. SWIFT Tools is not required to be in communication during this phase, but will provide indication of the progress of the upgrade when it is in communication. The distribution of the new application image may take up to 90 minutes depending on the...
The gateway will distribute the new application image to the mesh network of devices during this phase. SWIFT Tools is not required to be in communication during this phase, but will provide indication of the progress of the upgrade when it is in communication. The distribution of the new application image may take up to 90 minutes depending on the...
The gateway will distribute the new application image to the mesh network of devices during this phase. SWIFT Tools is not required to be in communication during this phase, but will provide indication of the progress of the upgrade when it is in communication. The distribution of the new application image may take up to 90 minutes depending on the...
The gateway will distribute the new application image to the mesh network of devices during this phase. SWIFT Tools is not required to be in communication during this phase, but will provide indication of the progress of the upgrade when it is in communication. The distribution of the new application image may take up to 90 minutes depending on the...
The gateway will distribute the new application image to the mesh network of devices during this phase. SWIFT Tools is not required to be in communication during this phase, but will provide indication of the progress of the upgrade when it is in communication. The distribution of the new application image may take up to 90 minutes depending on the...
The gateway will distribute the new application image to the mesh network of devices during this phase. SWIFT Tools is not required to be in communication during this phase, but will provide indication of the progress of the upgrade when it is in communication. The distribution of the new application image may take up to 90 minutes depending on the...
The gateway will distribute the new application image to the mesh network of devices during this phase. SWIFT Tools is not required to be in communication during this phase, but will provide indication of the progress of the upgrade when it is in communication. The distribution of the new application image may take up to 90 minutes depending on the...
The gateway will distribute the new application image to the mesh network of devices during this phase. SWIFT Tools is not required to be in communication during this phase, but will provide indication of the progress of the upgrade when it is in communication. The distribution of the new application image may take up to 90 minutes depending on the...
The gateway will distribute the new application image to the mesh network of devices during this phase. SWIFT Tools is not required to be in communication during this phase, but will provide indication of the progress of the upgrade when it is in communication. The distribution of the new application image may take up to 90 minutes depending on the...
The gateway will distribute the new application image to the mesh network of devices during this phase. SWIFT Tools is not required to be in communication during this phase, but will provide indication of the progress of the upgrade when it is in communication. The distribution of the new application image may take up to 90 minutes depending on the...
The gateway will distribute the new application image to the mesh network of devices during this phase. SWIFT Tools is not required to be in communication during this phase, but will provide indication of the progress of the upgrade when it is in communication. The distribution of the new application image may take up to 90 minutes depending on the...
The gateway will distribute the new application image to the mesh network of devices during this phase. SWIFT Tools is not required to be in communication during this phase, but will provide indication of the progress of the upgrade when it is in communication. The distribution of the new application image may take up to 90 minutes depending on the...
The gateway will distribute the new application image to the mesh network of devices during this phase. SWIFT Tools is not required to be in communication during this phase, but will provide indication of the progress of the upgrade when it is in communication. The distribution of the new application image may take up to 90 minutes depending on the...
The gateway will distribute the new application image to the mesh network of devices during this phase. SWIFT Tools is not required to be in communication during this phase, but will provide indication of the progress of the upgrade when it is in communication. The distribution of the new application image may take up to 90 minutes depending on the...
The gateway will distribute the new application image to the mesh network of devices during this phase. SWIFT Tools is not required to be in communication during this phase, but will provide indication of the progress of the upgrade when it is in communication. The distribution of the new application image may take up to 90 minutes depending on the...
The gateway will distribute the new application image to the mesh network of devices during this phase. SWIFT Tools is not required to be in communication during this phase, but will provide indication of the progress of the upgrade when it is in communication. The distribution of the new application image may take up to 90 minutes depending on the...
The gateway will distribute the new application image to the mesh network of devices during this phase. SWIFT Tools is not required to be in communication during this phase, but will provide indication of the progress of the upgrade when it is in communication. The distribution of the new application image may take up to 90 minutes depending on the...
The gateway will distribute the new application image to the mesh network of devices during this phase. SWIFT Tools is not required to be in communication during this phase, but will provide indication of the progress of the upgrade when it is in communication. The distribution of the new application image may take up to 90 minutes depending on the...
The gateway will distribute the new application image to the mesh network of devices during this phase. SWIFT Tools is not required to be in communication during this phase, but will provide indication of the progress of the upgrade when it is in communication. The distribution of the new application image may take up to 90 minutes depending on the...
The gateway will distribute the new application image to the mesh network of devices during this phase. SWIFT Tools is not required to be in communication during this phase, but will provide indication of the progress of the upgrade when it is in communication. The distribution of the new application image may take up to 90 minutes depending on the...
The gateway will distribute the new application image to the mesh network of devices during this phase. SWIFT Tools is not required to be in communication during this phase, but will provide indication of the progress of the upgrade when it is in communication. The distribution of the new application image may take up to 90 minutes depending on the...
The gateway will distribute the new application image to the mesh network of devices during this phase. SWIFT Tools is not required to be in communication during this phase, but will provide indication of the progress of the upgrade when it is in communication. The distribution of the new application image may take up to 90 minutes depending on the...
The gateway will distribute the new application image to the mesh network of devices during this phase. SWIFT Tools is not required to be in communication during this phase, but will provide indication of the progress of the upgrade when it is in communication. The distribution of the new application image may take up to 90 minutes depending on the...
The gateway will distribute the new application image to the mesh network of devices during this phase. SWIFT Tools is not required to be in communication during this phase, but will provide indication of the progress of the upgrade when it is in communication. The distribution of the new application image may take up to 90 minutes depending on the...
The gateway will distribute the new application image to the mesh network of devices during this phase. SWIFT Tools is not required to be in communication during this phase, but will provide indication of the progress of the upgrade when it is in communication. The distribution of the new application image may take up to 90 minutes depending on the...
The gateway will distribute the new application image to the mesh network of devices during this phase. SWIFT Tools is not required to be in communication during this phase, but will provide indication of the progress of the upgrade when it is in communication. The distribution of the new application image may take up to 90 minutes depending on the...
The gateway will distribute the new application image to the mesh network of devices during this phase. SWIFT Tools is not required to be in communication during this phase, but will provide indication of the progress of the upgrade when it is in communication. The distribution of the new application image may take up to 90 minutes depending on the...
The gateway will distribute the new application image to the mesh network of devices during this phase. SWIFT Tools is not required to be in communication during this phase, but will provide indication of the progress of the upgrade when it is in communication. The distribution of the new application image may take up to 90 minutes depending on the...
The gateway will distribute the new application image to the mesh network of devices during this phase. SWIFT Tools is not required to be in communication during this phase, but will provide indication of the progress of the upgrade when it is in communication. The distribution of the new application image may take up to 90 minutes depending on the...
The gateway will distribute the new application image to the mesh network of devices during this phase. SWIFT Tools is not required to be in communication during this phase, but will provide indication of the progress of the upgrade when it is in communication. The distribution of the new application image may take up to 90 minutes depending on the...
The Radio Hub communicates to a protocol compatible Fire Alarm Control panel, via its loop wiring connection. An LCD display is provided on the Radio Hub along with function buttons, to allow programming and diagnostics to be carried out for all associated devices and RCCs. The RCC is a wireless device requiring only a mains power connection.
- 2MB
- 40
Open Protocol Systems - An Explanation. Generally Open Protocol systems allow fire detection equipment and control panels to be compatible between a greater selection of manufacturers, offering you more freedom of choice when sourcing products and installation companies.
People also ask
How does a fire system communicate with a control panel?
What is an automatic fire alarm system?
Why should I choose a closed protocol fire detection system?
What are NFPA 72 communication methods?
Do emergency communication systems take priority over fire alarms?
How should EMS firecell radio installation work?
The SWIFT™ system is designed to work with current ONYX® AFP-3030 fire alarm control panels, a wireless gateway (FWSGAUS) and the wireless devices (detectors and module). The W-USBAUS is a wireless transmitter which aids in the site survey, mesh formation and diagnostics of the