  1. Step 3: Set the Deck Beam in Place. If possible, position or reattach string lines representing the sides of the deck. Align the beam with the string lines at each end. If you made the beam a bit longer than needed, overlap the string an equal distance on each end.

  2. In general, nail into the joists with 1 1/2-inch joist-hanger nails and nail into the beam with 10d to 16d common nails, as specified by the hanger manufacturer. Sizes for joists and beams are shown in the deck beam & joist span tables below. [Click to enlarge any image or table] This article series discuss best porch & deck construction practices.

  3. Aug 4, 2004 · In order to install a cantilevered beam you must have enough clearance below the joists to install the beam. Allow for a minimum of 6” airspace between the ground and the bottom of the beam. Always remember to install the beam crown side up so the weight of the deck will level itself. If you install a beam crown side down the deck is more ...

  4. New Deck Connection and Fastening Guide. The Deck Connection and Fastening Guide provides instructions on how to recognize defects and deficiencies in existing decks, and guidance for building strong, safe, long-lasting deck structures. Additionally, it goes detail by detail (ledger connection, joist-to-beam connection, beam-to-post connection ...

  5. Jun 8, 2010 · Building the beams in place. Once the ends are square, they plumb down to define the beam placement because they want splices to occur over the posts. Rick cuts the blocks, and after they’re placed, Ben assembles the beam, establishing the two ends and overlapping two long 2x8s. Now he can hook the ends and fill in the empty spots.

  6. Sep 23, 2013 · There are a number of ways to do this. Notched posts. A common method of addressing beam rotation is to notch a 6x6 post to accept a two-ply beam while leaving a 2 1/2-inch-thick attachment leg to bolt the beam to. Once the beam is fastened to the post with a pair of 1/2-inch bolts, the assembly will prevent beam rotation, and the integral post ...

  7. People also ask

  8. Apr 19, 2018 · By HomeAdvisor. Updated January 28, 2020. This is the second guide in a three-part series on how to build an attached deck. The last guide gave an overview of the planning and design process. Now we’ll get into installing the 4×4 posts and framework, including the ledger board, beams and rim joists. This guide assumes you have a good working ...